1.938 resultados
ref. Y10OS-00509sold by Unipub. Used - Good. Good condition. A copy that has been read but remains intact. May contain markings such as bookplates stamps limited notes and highlighting or a few light stains. sold by Unipub] unknown
ref. Y10OS-00510sold by Unipub. Used - Good. Good condition. Volume 6. A copy that has been read but remains intact. May contain markings such as bookplates stamps limited notes and highlighting or a few light stains. sold by Unipub] unknown
ref. Y10OS-00511sold by Unipub. Used - Good. Good condition. Volume 5. A copy that has been read but remains intact. May contain markings such as bookplates stamps limited notes and highlighting or a few light stains. sold by Unipub] unknown
1974ref. 64130Portland OR & Burlingame CA: Shannon & Wilson Inc. November - December 1974. Thick 4to. 11.25 x 12 x 3.25 in. Approx. 400 leaves sections variously numbered. w/ thumb tab sections printed typed captions included at fore-edges w/ over 100 maps many large folding boring core sample printed photos on matte finish stock folding charts graphs diagrams; additional appendix envelope w/ 2 large folding appendix updated blueprint maps inserted at rear. Original green vinyl 19-ring binder silver lettering stamped on front cover & spine occasional interior age toning shelfwear rubbing still a VG copy from the library of Dr. Clive F. “Rick” Kienle 1942-2025 geologist and specialist in aerial photo mapping w/ ownership signature on title. First edition of this exceedingly rare geotechnical report for a Pacific Power & Light Co. proposed nuclear power plant to have been constructed at West Roosevelt Washington along the edge of Lake Umatilla in the Columbia River Gorge as part of a group of similar nuclear power plants with the proposed Trojan Nuclear Power plant licensed to run beginning in 1976 at 1100 Megawatts. PP&L together with PG&E had previously examined 2 sites near Arlington OR but then shifted to this site near the Columbia River down from the Hanford Sites later developed for the WPPSS projects. Included are five borings for subsurface conditions 3 borings in the landslide areas geophysical survey to depth of 229 feet geologic mapping of faults stratigraphy and assessment of ground motion. The Slope Stability and Aerial Geological survey results were included in a later separate report by Dr. Rick Kienle.Several nuclear power plants had been proposed and received geotechnical studies in the Pacific Northwest following up the Trojan Nuclear Power Plant constructed upon the site of the former Trojan Powder Co. plant site as well as adjacent properties beginning in 1967. Pitched to PGE as a means to solve the exploding power usage demand in the fast-growing Portland OR area in the Mid-20th-Century by Admiral Lewis Strauss of the Atomic Energy Commission PGE and 13 other utilities began planning in 1967 and construction began July 30 1968. PGE chose to build a pressurized water reactor plant and the enormous plant and huge construction cost were projected at the time to be cheaper than coal-fired power plants to supplement the massive hydropower presence in the PNW. Oregon Governor Tom McCall established the first Nuclear Siting Task Force of the Nuclear Development Coordinating Committee in 1969 in order to approve location of nuclear power plants consistent with Oregon’s environmental protections as well as comply with the forthcoming Clean Air Act passed in 1970. No copies in Worldcat or other collections; See: Timeline of Oregon’s Energy History Oregon Department of Energy 2026. Shannon & Wilson, Inc., unknown
1974ref. 64128Portland OR & Burlingame CA: Shannon & Wilson Inc. November - December 1974. Thick 4to. 11.25 x 12 x 3.25 in. Approx. 400 leaves sections variously numbered. w/ thumb tab sections printed typed captions included at fore-edges w/ over 100 maps many large folding boring core sample printed photos on matte finish stock folding charts graphs diagrams; additional appendix envelope w/ 4 large folding appendix updated blueprint maps inserted at rear. Original green vinyl 19-ring binder silver lettering stamped on front cover & spine occasional interior age toning shelfwear rubbing still a VG copy from the library of Dr. Clive F. “Rick” Kienle 1942-2025 geologist and specialist in aerial photo mapping w/ ownership signature on title. First edition of this exceedingly scarce geotechnical report for a Pacific Power & Light Co. proposed nuclear power plant to have been constructed on Calapooya Creek near Sutherlin Oregon as part of a group with the proposed Trojan Nuclear Power plant licensed to run beginning in 1976 at 1100 Megawatts. This report examined the borings for subsurface conditions and proposed companion dam site for the nuclear plant seismic refraction survey geological studies Side Looking Airborne Radar SLAR survey seismic faults ground water condition reviews and more. Regional geological studies consisted of surveying local similar geologic and mining literature an in-depth examination of the aerial photographs carried under the direction of Dr. Kienle as well as in-field reconnaissance of several faults and folds to define the major geologic structures in the area to determine feasibility for siting a nuclear power plant.Several nuclear power plants had been proposed and received geotechnical studies in the Pacific Northwest following up the Trojan Nuclear Power Plant constructed upon the site of the former Trojan Powder Co. plant site as well as adjacent properties beginning in 1967. Pitched to PGE as a means to solve the exploding power usage demand in the fast-growing Portland OR area in the Mid-20th-Century by Admiral Lewis Strauss of the Atomic Energy Commission PGE and 13 other utilities began planning in 1967 and construction began July 30 1968. PGE chose to build a pressurized water reactor plant and the enormous plant and huge construction cost were projected at the time to be cheaper than coal-fired power plants to supplement the massive hydropower presence in the PNW. Oregon Governor Tom McCall established the first Nuclear Siting Task Force of the Nuclear Development Coordinating Committee in 1969 in order to approve location of nuclear power plants consistent with Oregon’s environmental protections as well as comply with the forthcoming Clean Air Act passed in 1970. No copies in Worldcat or other collections; See: Timeline of Oregon’s Energy History Oregon Department of Energy 2026. Shannon & Wilson, Inc., unknown
1974ref. 64132Portland OR: Portland General Electric Company 1974-1979. Two vols. hick 4to. 11.25 x 11.75 x 3.25 in. Approx. 1200 leaves sections variously numbered. w/ thumb tab sections printed affixed at fore-edges w/ over 100 maps many large folding most colour folding charts graphs diagrams; large folding site map in vol. 2. Original green vinyl 3-ring binders black lettering stamped on front covers & spines occasional interior age toning shelfwear rubbing still a VG set from the library of Dr. Clive F. “Rick” Kienle 1942-2025 geologist and specialist in aerial photo mapping . First edition of this very scarce original safety analyses reports for Portland General Electric’s pair of nuclear power plants to have been constructed at Pebble Springs in Gilliam County Oregon as part of a group with the proposed Trojan Nuclear Power plant licensed to run beginning in 1976 at 1100 Megawatts. These nuclear power plants had been proposed and begun development soon after construction began at the Trojan Nuclear Power Plant and by 1979 over $ 250 million had been spent by the State of Oregon and PGE on development costs. The two reactors would have been located 3 miles southeast of the Columbia River would have consisted of a Nuclear Steam System for each plant with a Reactor Coolant System supplied by Babcock & Wilcox square lattice reactor cores and abundant auxiliary systems. These reports include a myriad of updates carried out during the regulatory review of the project and the preliminary development work but after passage in 1980 of Ballot Measure 7 by Oregon voters no nuclear power plants could be considered for construction unless there was a Federal high-level waste repository and approval by Oregon voters. Several nuclear power plants had been proposed and received geotechnical studies in the Pacific Northwest following up the Trojan Nuclear Power Plant constructed upon the site of the former Trojan Powder Co. plant site as well as adjacent properties beginning in 1967. Pitched to PGE as a means to solve the exploding power usage demand in the fast-growing Portland OR area in the Mid-20th-Century by Admiral Lewis Strauss of the Atomic Energy Commission PGE and 13 other utilities began planning in 1967 and construction began July 30 1968. PGE chose to build a pressurized water reactor plant and the enormous plant and huge construction cost were projected at the time to be cheaper than coal-fired power plants to supplement the massive hydropower presence in the PNW. Oregon Governor Tom McCall established the first Nuclear Siting Task Force of the Nuclear Development Coordinating Committee in 1969 in order to approve location of nuclear power plants consistent with Oregon’s environmental protections as well as comply with the forthcoming Clean Air Act passed in 1970. Should be noted that the original Pebble Springs site is now the location of a massive 99 Megawatt Wind Farm. Worldcat locates 4 copies of similar reports divided into more volumes - Multnomah County PSU UO WA State Lib; See: Timeline of Oregon’s Energy History Oregon Department of Energy 2026; McTeague Renewable Energy Not Nuclear is the Oregon Way Oregon Capital Chronicle March 26 2026. Portland General Electric Company, unknown
1976ref. 64131Portland OR: Shannon & Wilson Inc. Northwest Geological Services Inc. February 1976. 4to. 11.25 x 12 in. Approx. 250 leaves sections variously numbered. w/ several maps many large folding hand-coloured folding charts graphs diagram 7 mounted colour photos folding maps inserted into rear pocket. Original green vinyl 19-ring binder silver lettering stamped on front cover & spine occasional interior age toning shelfwear rubbing still a VG copy from the library of Dr. Clive F. “Rick” Kienle 1942-2025 geologist and specialist in aerial photo mapping w/ business card mounted on front inner cover. First edition of this exceedingly rare slope stability report for a Pacific Power & Light Co.’s proposed nuclear power plant to have been constructed at West Roosevelt Washington along the edge of Lake Umatilla in the Columbia River Gorge as part of a group of similar nuclear power plants with the proposed Trojan Nuclear Power plant licensed to run beginning in 1976 at 1100 Megawatts. PP&L together with PG&E had previously examined 2 sites near Arlington OR but then shifted to this site near the Columbia River down from the Hanford Sites later developed for the WPPSS projects. This report focuses on the stability of the slopes to the north of the proposed site and estimate the effect of the design earthquake on slope stability and plant safety. This required nine additional borings geologic mapping of the area identification of basalt outrcops by chemical petrographic and remnant magnetism analyses lab studies liquefaction analyses along with construction of a 3-D model of the site. Several nuclear power plants had been proposed and received geotechnical studies in the Pacific Northwest following up the Trojan Nuclear Power Plant constructed upon the site of the former Trojan Powder Co. plant site as well as adjacent properties beginning in 1967. Pitched to PGE as a means to solve the exploding power usage demand in the fast-growing Portland OR area in the Mid-20th-Century by Admiral Lewis Strauss of the Atomic Energy Commission PGE and 13 other utilities began planning in 1967 and construction began July 30 1968. PGE chose to build a pressurized water reactor plant and the enormous plant and huge construction cost were projected at the time to be cheaper than coal-fired power plants to supplement the massive hydropower presence in the PNW. Oregon Governor Tom McCall established the first Nuclear Siting Task Force of the Nuclear Development Coordinating Committee in 1969 in order to approve location of nuclear power plants consistent with Oregon’s environmental protections as well as comply with the forthcoming Clean Air Act passed in 1970. No copies in Worldcat or other collections; See: Timeline of Oregon’s Energy History Oregon Department of Energy 2026. Shannon & Wilson, Inc., Northwest Geological Services, Inc., unknown
1974ref. 64129Portland OR & Burlingame CA: Shannon & Wilson Inc. November - December 1974. Thick 4to. 11.25 x 12 x 3.25 in. Approx. 400 leaves sections variously numbered. w/ thumb tab sections printed typed captions included at fore-edges w/ over 100 maps many large folding boring core sample printed photos on matte finish stock folding charts graphs diagrams; additional appendix envelope w/ 2 large folding appendix updated blueprint maps inserted at rear. Original green vinyl 19-ring binder silver lettering stamped on front cover & spine occasional interior age toning shelfwear rubbing still a VG copy from the library of Dr. Clive F. “Rick” Kienle 1942-2025 geologist and specialist in aerial photo mapping. First edition of this exceedingly scarce geotechnical report for a Pacific Power & Light Co. proposed nuclear power plant to have been constructed at Lebanon Oregon as part of a group with the proposed Trojan Nuclear Power plant licensed to run beginning in 1976 at 1100 Megawatts. This report examined the site due to its very low historic seismic activity. Included are seven borings for subsurface conditions a laboratory test program measuring the dynamic and static engineering properties of the boring core samples seismic refraction survey geological studies Side Looking Airborne Radar SLAR survey seismic faults ground water condition reviews and more. Regional geological studies consisted of surveying local similar geologic and mining literature as well as a more abbreviated December 1973 report incorporated into this much larger in-depth examination OSU Professor Richard Couch serving as seismology consultant the aerial photographs carried under the direction of Dr. Kienle as well as in-field reconnaissance of several faults and folds to define the major geologic structures in the area to determine feasibility for siting a nuclear power plant.Several nuclear power plants had been proposed and received geotechnical studies in the Pacific Northwest following up the Trojan Nuclear Power Plant constructed upon the site of the former Trojan Powder Co. plant site as well as adjacent properties beginning in 1967. Pitched to PGE as a means to solve the exploding power usage demand in the fast-growing Portland OR area in the Mid-20th-Century by Admiral Lewis Strauss of the Atomic Energy Commission PGE and 13 other utilities began planning in 1967 and construction began July 30 1968. PGE chose to build a pressurized water reactor plant and the enormous plant and huge construction cost were projected at the time to be cheaper than coal-fired power plants to supplement the massive hydropower presence in the PNW. Oregon Governor Tom McCall established the first Nuclear Siting Task Force of the Nuclear Development Coordinating Committee in 1969 in order to approve location of nuclear power plants consistent with Oregon’s environmental protections as well as comply with the forthcoming Clean Air Act passed in 1970. No copies in Worldcat or other collections; See: Timeline of Oregon’s Energy History Oregon Department of Energy 2026. Shannon & Wilson, Inc., unknown
ref. B9781442225114Paperback / softback. New. paperback
ref. B9781497307681Paperback / softback. New. paperback
ref. B9781497312906Paperback / softback. New. paperback
ref. B9781500615598Paperback / softback. New. paperback
ref. B9781497312920Paperback / softback. New. paperback
ref. B9781497373235Paperback / softback. New. paperback
ref. B9781497307841Paperback / softback. New. paperback
ref. B9781410217073Paperback / softback. New. paperback
ref. B9781497307469Paperback / softback. New. paperback
ref. A9780309303057Paperback / softback. New. paperback
1985ref. AME_9780309035286NA 1985. N/A. Paperback. New/New. _ NA paperback
1956ref. 56600Baton Rouge LA: Army & Navy Publishing Inc. 1956. 8vo. 80 pp unpaginated. Photo-illustrated throughout many colour plates text & captions printed in blue & red black white photo illustrations colour borders. Colour-illustrated softcovers red plastic comb binding as issued minor soiling front cover minor shelfwear still VG- copy. First edition of this souvenir yearbook detailing the largest field trials held in the United States following World War II testing Army and Air Force personnel under conditions of simulated nuclear war even including the faked dropping of an atomic bomb. A number of experimental groups were introduced including a Sky Cavalry which combined the 82nd Airborne with a helicopter unit although there was controversy following the exercises with Armor wanting helicopters attached to mechanized cavalry units and Intelligence wanting aircraft with radar and infrared sensors. Unfortunately the massive maneuvers covering 45 days resulted in massive traffic jams with mechanized units trying to attack during torrential downpours and other logistics issues emerged which the US military attempted to correct when they later applied many of the results to new tactics during the Vietnam War. Worldcat locates 3 copies Filson Historical Society US Army War College Artillery School only copy dated correctly; Rickey Robertson Exercise Sage Brush 1955 Stephen F. Austin State University January 2013. Army & Navy Publishing, Inc., paperback
ref. 36862-A-65758A.W. Wright Nuclear Structure Laboratory/Yale University New Haven 1987. The first volume from the August 7 1987 has a signed dedication in ink from D. Allan Bromley to Rolf Siemssen. The Symposium was published on August 7. Both paperbacks with many ills in black and white. -good.-The spines are sunned signs of use on the covers but overall the books are in good condition. A.W. Wright Nuclear Structure Laboratory/Yale University, New Haven, 1987 paperback
ref. B9781249589594Paperback / softback. New. paperback
ref. B9781286862872Paperback / softback. New. paperback
ref. B9781286863343Paperback / softback. New. paperback
ref. 20301649-nnew. unknown