8 578 résultats
2010réf. 86124Washington DC: National Aeronautics and Space Administration 2010. Xerox-style reproduction. Assume relatively few copies made for media representatives. Stapled at upper left corner. Very good. ii 104 pages plus front cover. No rear cover. Illustrations. Three-hole punched. Logo of the United Space Alliance on the front cover. Includes STS-132/ULF4 Mission Overview; STS-132 Timeline Overview; Mission Profile; Mission Objectives; Mission Personnel; STS-132 Crew; Payload Overview; Rendezvous & Docking; Spacewalks; Experiments; History of Space Shuttle Atlantis; Shuttle Reference Data; Launch and Landing; Acronmyns and Abbreviations; Media Assistance; Public Affairs Contacts. STS-132 ISS assembly flight ULF4 was a NASA Space Shuttle mission during which Space Shuttle Atlantis docked with the International Space Station on May 16 2010. STS-132 was launched from the Kennedy Space Center on May 14 2010. The primary payload was the Russian Rassvet Mini-Research Module along with an Integrated Cargo Carrier-Vertical Light Deployable ICC-VLD. Atlantis landed at the Kennedy Space Center on May 26 2010. STS-132 was initially scheduled to be the final flight of Atlantis provided that the STS-335/STS-135 Launch On Need rescue mission would not be needed. However in February 2011 NASA declared that the final mission of Atlantis and of the Space Shuttle program STS-135 would be flown regardless of the funding situation. Also on board Atlantis was a 4-inch long wood sample of Sir Isaac Newton's apple tree. The piece from the original tree that supposedly inspired Newton's theory of gravity along with a picture of Newton were taken into orbit by astronaut Piers Sellers. The wood is part of the collection of the Royal Society archives in London and was returned there following the flight. Additionally a flag from Clarkson University Potsdam New York flew on board shuttle Atlantis. It was there in honor of STS-132 lead shuttle flight director Michael L. Sarafin who is an alumnus of the Clarkson University. The STS-132 mission patch was designed by NASA artist Sean Collins working with astronaut Garrett Reisman. The patch shows Atlantis flying towards a sunset landing with the names of the STS-132 astronauts around the border. During the standard post-flight inspection of Atlantis a United Space Alliance inspector found a STS-132 mission decal accompanied by an inscription "The first last flight of Atlantis left Earth on 14 May 2010 from Pad 39A" together with the crew's signatures. The worker had found it tucked away on the upper side of Locker A-16 while scanning the area with a mirror. Moreover he said the note must have been written in orbit since otherwise the author would have had to stand on their head to write it. At the time the note was written STS-132 was the last planned mission of Atlantis. However one further mission was ultimately approved for the shuttle: STS-135 which was to be the last flight of both Atlantis and the Space Shuttle program. National Aeronautics and Space Administration unknown
2009réf. 86122George C. Marshall Space Flight Center Huntsville A.: National Aeronautics and Space Administration George C. Marshall Space Flight Center 2009. Xerox-style reproduction. Assume only a few copies were made for medial representatives. Stapled at upper left corner. Good. Front cover i 1 36 2 pages. Illustrations. Three-hole punched. The top corner of some of the some of the back pages are bent/creased. Contents include Contacts; Media Services Information; LRO/LCROSS Executive Summary; Mission Quick Facts; LRO Quick Facts; LCROSS Quick Facts; Launch Vehicles Mated with LRO/LCROSS; LRO/LCROSS Mission Trajectory; Why the Moon; Historical Explorations of the Moon; LRO Mission Overview; LRO Mission at a Glance; LRO Instruments; LRO Across the Country; LRO Products and Benefits: LRO Spacecraft With Instruments; Treasure Hunting on the Moon: LRO and the Search for Water; Robot Scout: Fly Me Safely to the Moon; LCROSS Mission Overview; LCROSS Mission at a Glance; The Search for Water on the Moon; LCROSS Science Instruments; LCROSS Spacecraft; LCROSS Observation Campaign; Future NASA Lunar Missions; and Program/Project Oversight. The Lunar Reconnaissance Orbiter LRO is a NASA robotic spacecraft currently orbiting the Moon in an eccentric polar mapping orbit. Data collected by LRO have been described as essential for planning NASA's future human and robotic missions to the Moon. Its detailed mapping program is identifying safe landing sites locating potential resources on the Moon characterizing the radiation environment and demonstrating new technologies. Launched on June 18 2009 in conjunction with the Lunar Crater Observation and Sensing Satellite LCROSS as the vanguard of NASA's Lunar Precursor Robotic Program LRO was the first United States mission to the Moon in over ten years. LRO and LCROSS were launched as part of the United States's Vision for Space Exploration program. The probe has made a 3-D map of the Moon's surface at 100-meter resolution and 98.2% coverage excluding polar areas in deep shadow including 0.5-meter resolution images of Apollo landing sites. The first images from LRO were published on July 2 2009 showing a region in the lunar highlands south of Mare Nubium Sea of Clouds. The total cost of the mission is reported as US$583 million of which $504 million pertains to the main LRO probe and $79 million to the LCROSS satellite. As of 2019 LRO has enough fuel to continue operations for at least seven more years and NASA expects to continue utilizing LRO's reconnaissance capabilities to identify sites for lunar landers well into the 2020s. The Lunar Crater Observation and Sensing Satellite LCROSS was a robotic spacecraft operated by NASA. The mission was conceived as a low-cost means of determining the nature of hydrogen detected at the polar regions of the Moon. Launched immediately after discovery of lunar water by Chandrayaan-1 the main LCROSS mission objective was to further explore the presence of water in the form of ice in a permanently shadowed crater near a lunar polar region. It was successful in confirming water in the southern lunar crater Cabeus. It was launched together with the Lunar Reconnaissance Orbiter LRO on June 18 2009 as part of the shared Lunar Precursor Robotic Program the first American mission to the Moon in over ten years. LCROSS was designed to collect and relay data from the impact and debris plume resulting from the launch vehicle's spent Centaur upper stage and data-collecting Shepherding Spacecraft striking the crater Cabeus near the south pole of the Moon. Centaur had nominal impact mass of 5081 lb and an impact velocity of about 5600 mph releasing the kinetic energy equivalent of detonating approximately 2 tons of TNT. LCROSS suffered a malfunction on August 22 depleting half of its fuel and leaving very little fuel margin in the spacecraft. Centaur impacted successfully on October 9 2009 at 11:31 UTC. The Shepherding Spacecraft descended through Centaur's ejectate plume collected and relayed data impacting six minutes later at 11:37 UTC. Contrary to media reports at the time neither the impact nor its dust cloud could be seen from Earth using the naked eye or telescopes. National Aeronautics and Space Administration, George C. Marshall Space Flight Center unknown
2011réf. 86130Washington DC: National Aeronautics and Space Administration 2011. Xerox-style reproduction. Assumed to be one of only a few produced for media representatives. Stapled at upper left corner. Very good. 63 1 pages. Illustrations. Mars Science Laboratory MSL is a robotic space probe mission to Mars launched by NASA on November 26 2011 which successfully landed Curiosity a Mars rover in Gale Crater on August 6 2012. The overall objectives include investigating Mars' habitability studying its climate and geology and collecting data for a human mission to Mars. The rover carries a variety of scientific instruments designed by an international team. Contents include Media Services Information; Quick Facts; Mars at a Glance: Mars Science Laboratory Investigations; Mission Overview; Comparing Two Mars Rover Projects; Spacecraft; Mars Science Laboratory Landing Site; Recent Current and Upcoming Missions; Mars Science: A Story of Changes; Historical Mars Missions; and Program/Project Management. For several reasons a different landing system was chosen for MSL compared to previous Mars landers and rovers. Curiosity was considered too heavy to use the airbag landing system as used on the Mars Pathfinder and Mars Exploration Rovers. The MSL engineers came up with a novel alternative solution: the sky crane. The sky crane system lowered the rover with a 25 ft tether to a soft landing—wheels down—on the surface of Mars. This system consists of a bridle lowering the rover on three nylon tethers and an electrical cable carrying information and power between the descent stage and rover. As the support and data cables unreeled the rover's six motorized wheels snapped into position. At roughly 25 ft below the descent stage the sky crane system slowed to a halt and the rover touched down. After the rover touched down it waited two seconds to confirm that it was on solid ground by detecting the weight on the wheels and fired several pyros small explosive devices activating cable cutters on the bridle and umbilical cords to free itself from the descent stage. The descent stage then flew away to a crash landing 2100 ft away. The sky crane concept had never been used in missions before. National Aeronautics and Space Administration unknown
2009réf. 86136Washington DC: National Aeronautics and Space Administration 2009. Xerox-style reproduction. Assumed only a few copies were made for media representatives. Stapled at upper left corner. Very good. ii 110 pages plus covers. Illustrations. Three-hole punched. The contents include STS-129/ULF-3 Mission Overview; STS-129 Timeline Overview; Mission Profile; Mission Objectives; Mission Personnel; STS-129 Crew; Payload Overview; Rendezvous & Docking; Spacewalks; Experiments; Shuttle Reference Data; Launch and Landing; Acronym and Abbreviations; Media Assistance and Public Affairs Contacts. STS-129 ISS assembly flight ULF3 was a NASA Space Shuttle mission to the International Space Station ISS. Atlantis was launched on November 16 2009 at 14:28 EST and landed at 09:44 EST on November 27 2009 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last Shuttle mission of the 2000s. STS-129 focused on staging spare components outside the station. The 11-day flight included three spacewalks. The payload bay carried two large ExPRESS Logistics Carriers holding two spare gyroscopes two nitrogen tank assemblies two pump modules an ammonia tank assembly a spare latching end effector for the station's robotic arm a spare trailing umbilical system for the Mobile Transporter and a high-pressure gas tank. STS-129 was the first flight of an ExPRESS Logistics Carrier. The STS-129 mission patch was designed by Tim Gagnon and Dr. Jorge Cartes. The unusual shape of the patch resulted from the crew's desire for the patch to signify the mission's payload two ExPRESS Logistics Carriers providing equipment ensuring the longevity of the ISS. The insignia incorporates a number of design elements not typically incorporated into a single patch: the Sun Moon Mars NASA's astronaut symbol the ISS the Shuttle orbiter and the continental United States. The 13 stars on the patch represent the crewmembers' children and the Moon and Mars represent the future of space exploration. The names of the crew members are denoted on the outer band of the patch. The primary payloads were the Express Logistics Carriers designated ELC-1 and ELC-2 for the International Space Station ISS. The units carried a variety of tools and equipment designed to augment and enhance experimentation aboard ISS. Docking between Atlantis and ISS occurred on November 18 2009. Undocking occurred on November 25 2009. There were three spacewalks during the mission. The first spacewalk was conducted on November 19 2009 and lasted 6 hours 37 minutes. Astronauts Foreman and Satcher installed a spare antenna and a bracket for ammonia lines outside ISS. They also performed maintenance activities on the ISS Japanese robotic arm. The second spacewalk was conducted on November 21 2009 and lasted 6 hours 8 minutes. Astronauts Foreman and Bresnik installed the Grappling Adaptor to On-Orbit Railing GATOR to the ISS Columbus Laboratory plus an additional ham radio antenna. They also installed an antenna for wireless helmet camera video and relocated the Floating Potential Measurement Unit which takes electrical measurements outside ISS. The third spacewalk was conducted on November 23 2009 and lasted 5 hours 42 minutes. Astronauts Satcher and Bresnik installed an oxygen filled High Pressure Gas Tank on the ISS Quest Airlock. They also installed experiments to ELC-2 as well as a number of other maintenance activities. National Aeronautics and Space Administration unknown
2011réf. 86129Washington DC: National Aeronautics and Space Administration 2011. Xerox-style reproduction. Presumed to be one of only a few copies made for media representatives. Stapled at upper left corner. Very good. 25 1 pages. Illustrations. Contents include Media Services Information; Quick Facts; Jupiter at a Glance; Why Juno; Mission Overview; Mission Phases; Spacecraft; Science Overview; Missions to Jupiter; and Program/Project Management. Juno is a NASA space probe orbiting the planet Jupiter. It was built by Lockheed Martin and is operated by NASA's Jet Propulsion Laboratory. The spacecraft was launched from Cape Canaveral Air Force Station on August 5 2011 UTC as part of the New Frontiers program. Juno entered a polar orbit of Jupiter on July 5 2016 UTC to begin a scientific investigation of the planet. After completing its mission Juno will be intentionally deorbited into Jupiter's atmosphere. Juno's mission is to measure Jupiter's composition gravitational field magnetic field and polar magnetosphere. It will also search for clues about how the planet formed including whether it has a rocky core the amount of water present within the deep atmosphere mass distribution and its deep winds which can reach speeds up to 390 mph. Juno is the second spacecraft to orbit Jupiter after the nuclear powered Galileo orbiter which orbited from 1995 to 2003. Juno is powered by solar panels commonly used by satellites orbiting Earth and working in the inner Solar System whereas radioisotope thermoelectric generators are commonly used for missions to the outer Solar System and beyond. For Juno however the three largest solar panel wings ever deployed on a planetary probe play an integral role in stabilizing the spacecraft as well as generating power. During the science mission infrared and microwave instruments will measure the thermal radiation emanating from deep within Jupiter's atmosphere. These observations will complement previous studies of its composition by assessing the abundance and distribution of water and therefore oxygen. This data will provide insight into Jupiter's origins. Juno will also investigate the convection that drives natural circulation patterns in Jupiter's atmosphere. Other instruments aboard Juno will gather data about its gravitational field and polar magnetosphere. The Juno mission was planned to conclude in February 2018 after completing 37 orbits of Jupiter but now has been commissioned through 2025 to do a further 42 additional orbits of Jupiter as well as close flybys of Ganymede Europa and Io. The probe was then intended to be deorbited and burnt up in Jupiter's outer atmosphere to avoid any possibility of impact and biological contamination of one of its moons. The Juno spacecraft's suite of science instruments will: Determine the ratio of oxygen to hydrogen effectively measuring the abundance of water in Jupiter which will help distinguish among prevailing theories linking Jupiter's formation to the Solar System; Obtain a better estimate of Jupiter's core mass which will also help distinguish among prevailing theories linking Jupiter's formation to the Solar System; Precisely map Jupiter's gravitational field to assess the distribution of mass in Jupiter's interior including properties of its structure and dynamics; Precisely map Jupiter's magnetic field to assess the origin and structure of the field and the depth at which the planet's magnetic field is created. This experiment will also help scientists understand the fundamental physics of dynamo theory; Map the variation in atmospheric composition temperature structure cloud opacity and dynamics to pressures far greater than 100 bar 10 MPa; 1500 psi at all latitudes; Characterize and explore the three-dimensional structure of Jupiter's polar magnetosphere and auroras; and Measure the orbital frame-dragging known also as Lense-Thirring precession caused by the angular momentum of Jupiter and possibly a new test of general relativity effects connected with the Jovian rotation. National Aeronautics and Space Administration unknown
2007réf. 86117Kennedy Space Center FL: National Aeronautics and Space Administration Kennedy Space Center 2007. Presumed First Edition First printing. Wraps. Very good. The format is approximately 8.25 inches by 11 inches. 8 pages. Illustrations some in color. This includes information on STS-114 STS-121 STS-115 and STS-116 the 17th 18th 19th and 20th Space Station flights The write-ups include mission highlights EVAs Launch and Landing. A latter version of Volume 3 had 12 pages and included two more missions into 2007. This variant is now quite scarce having been superseded. The International Space Station ISS is the largest modular space station in low Earth orbit. The project involves five space agencies: the United States' NASA Russia's Roscosmos Japan's JAXA Europe's ESA and Canada's CSA. The ownership and use of the space station is established by intergovernmental treaties and agreements. The station serves as a microgravity and space environment research laboratory in which scientific research is conducted in astrobiology astronomy meteorology physics and other fields. The ISS is suited for testing the spacecraft systems and equipment required for possible future long-duration missions to the Moon and Mars. The Space Shuttle was a partially reusable low Earth orbital spacecraft system operated by NASA the National Aeronautics and Space Administration. Its official program name was Space Transportation System STS taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. Operational missions launched numerous satellites conducted science experiments in orbit and participated in construction and servicing of the International Space Station ISS. The first of four orbital test flights occurred in 1981 leading to operational flights beginning in 1982. From 1981 to 2011 a total of 135 missions were flown all launched from Kennedy Space Center KSC in Florida. During that time period the fleet logged 1322 days 19 hours 21 minutes and 23 seconds of flight time. The longest orbital flight of the Shuttle was STS-80 at 17 days 15 hours while the shortest flight was STS-51-L at one minute 13 seconds when the Space Shuttle Challenger broke apart during launch. The cold morning shrunk an O-Ring on the right Solid Rocket Booster causing the external fuel tank to explode. The shuttles docked with Russian space station Mir nine times and visited the ISS thirty-seven times. The highest altitude apogee achieved by the shuttle was 386 milrd when deploying the Hubble Space Telescope. The program flew a total of 355 people representing 16 countries and with 852 total shuttle fliers. The Kennedy Space Center served as the landing site for 78 missions while 54 missions landed at Edwards Air Force Base in California and one mission landed at White Sands New Mexico. The first orbiter built Enterprise was used for atmospheric flight tests ALT but future plans to upgrade it to orbital capability were ultimately canceled. Four fully operational orbiters were initially built: Columbia Challenger Discovery and Atlantis. Challenger and Columbia were destroyed in mission accidents in 1986 and 2003 respectively killing a total of fourteen astronauts. A fifth operational orbiter Endeavour was built in 1991 to replace Challenger. The Space Shuttle was retired from service upon the conclusion of STS-135 by Atlantis on 21 July 2011. National Aeronautics and Space Administration, Kennedy Space Center paperback
2011réf. 86133Washington DC: National Aeronautics and Space Administration 2011. Xerox-style reproduction presumably one of only a few press kits produced. Stapled at upper left corner. Very good. ii 164 pages plus covers. This also has the logo of the United Space Alliance on the front cover. STS-135 ISS assembly flight ULF7 was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission which was not flown. STS-135 launched on July 8 2011 and landed on July 21 2011 following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983. The mission's primary cargo was the Multi-Purpose Logistics Module MPLM Raffaello and a Lightweight Multi-Purpose Carrier LMC which were delivered to the International Space Station ISS. The flight of Raffaello marked the only time that Atlantis carried an MPLM. This press kit covers the Space Shuttle History; STS-135 Mission Timeline Profile and Objectives; Mission Personnel; STS-135 Atlantis Crew; Payload Overview; Rendezvous and Docking; Spacewalks; STS-135 Experiments; Shuttle Reference Data; Launch & Landing; Acronyms & Abbreviations; Media Assistance; Public Affairs Contacts; and The Future. Although the mission was authorized it initially had no appropriation in the NASA budget raising questions about whether the mission would fly. On January 20 2011 program managers changed STS-335 to STS-135 on the flight manifest. This allowed for training and other mission specific preparations. On February 13 2011 program managers told their workforce that STS-135 would fly regardless of the funding situation via a continuing resolution. Until this point there had been no official references to the STS-135 mission in NASA documentation for the general public. During an address at the Marshall Space Flight Center on November 16 2010 NASA administrator Charles Bolden said that the agency needed to fly STS-135 to the station in 2011 due to possible delays in the development of commercial rockets and spacecraft designed to transport cargo to the ISS. "We are hoping to fly a third shuttle mission in addition to STS-133 and STS-134 in June 2011 what everybody calls the launch-on-need mission. and that's really needed to buy down the risk for the development time for commercial cargo" Bolden said. The mission was included in NASA's 2011 authorization which was signed into law on October 11 2010 but funding remained dependent on a subsequent appropriations bill. United Space Alliance signed a contract extension for the mission along with STS-134; the contract contained six one-month options with NASA in order to support continuing operations. The federal budget approved in April 2011 called for US$5.5 billion for NASA's space operations division including the shuttle and space station programs. According to NASA the budget running through September 30 2011 ended all concerns about funding the STS-135 mission. On July 21 2011 NASA hosted an employee appreciation event outside OPF-2 with Atlantis parked. Cheryl Hurst the director of education and external relations at KSC spoke first and invited Susan Lambert to lead the crowd with the American national anthem. A pledge of allegiance followed from KSC children and NASA Administrator Charles Bolden and KSC Director Robert Cabana spoke to the shuttle program employees. During the event Rita Wilcoxson and Patricia Stratton were presented with highest NASA honors: the Distinguished Service Medal and the Distinguished Public Service Medal respectively. The citations on both were identical stating "for continuous outstanding leadership contributions provided to the nation's space shuttle program". A public "welcome home" ceremony was held for the crew at Houston's Ellington Field Hangar 990 on July 22. National Aeronautics and Space Administration unknown
2007réf. 86128Washington DC: National Aeronautics and Space Administration 2007. Presumed First Edition First printing. Comb binding. Very good. 50 pages including covers. Decorative front cover. Phoenix was an uncrewed space probe that landed on the surface of Mars on May 25 2008 and operated until November 2 2008. Phoenix was operational on Mars for 157 sols 161 days. Its instruments were used to assess the local habitability and to research the history of water on Mars. The mission was part of the Mars Scout Program; its total cost was $420 million including the cost of launch. The multi-agency program was led by the Lunar and Planetary Laboratory at the University of Arizona with project management by NASA's Jet Propulsion Laboratory. Academic and industrial partners included universities in the United States Canada Switzerland Denmark Germany the United Kingdom NASA the Canadian Space Agency the Finnish Meteorological Institute Lockheed Martin Space Systems MacDonald Dettwiler & Associates MDA in partnership with Optech Incorporated Optech and other aerospace companies. It was the first NASA mission to Mars led by a public university. Phoenix was NASA's sixth successful landing on Mars from seven attempts and the first in Mars' polar region. The lander completed its mission in August 2008 and made a last brief communication with Earth on November 2 as available solar power dropped with the Martian winter. The mission was declared concluded on November 10 2008 after engineers were unable to re-contact the craft. JPL declared the lander to be dead. The program was considered a success because it completed all planned science experiments and observations. The mission had two goals. One was to study the geological history of water the key to unlocking the story of past climate change. The second was to evaluate past or potential planetary habitability in the ice-soil boundary. Phoenix's instruments were suitable for uncovering information on the geological and possibly biological history of the Martian Arctic. Phoenix was the first mission to return data from either of the poles and contributed to NASA's main strategy for Mars exploration "Follow the water." A press kit often referred to as a media kit is a pre-packaged set of promotional materials that provide information about a person company organization or cause and which is distributed to members of the media for use. Press kits are often distributed to announce a release or for a news conference. Traditionally the term "press kit" referred to a set of documents photographs such as publicity stills and other relevant materials packaged together and such a kit was designed to be sent to a newspaper or magazine as part of an organization's public relations or promotional program. There is no universal guide to the elements that should be included in a press kit or media kit but the following are common components: Backgrounder with historical information on the company or individual; Fact sheet listing specific features statistics or benefits; Biographies of key executives individuals artists etc.; Past press coverage; Photos or other images; a press release; and media contact information. National Aeronautics and Space Administration unknown
2003réf. 86119Kennedy Space Center FL: National Aeronautics and Space Administration Kennedy Space Center 2003. Presumed First Edition First printing. Wraps. Very good. The format is approximately 8.5 inches by 11 inches. 61 3 pages plus covers. Illustrated covers. Illustrations most in color. Contents include Center Director's Message; NASA Vision and Mission; KSC Goals and Principles; The President's Management Agenca; Significant Events; Expendable Launch Vehicle Program; Space Shuttle Program; Shuttle Upgrades; International Space Station and Shuttle Payload Processing; Payload Carriers Program; Spaceport and Range Technologies; Future Vehicles; Safety and Health First; Environmental Stewardship; Partnerships; Outreach to the World; Education; KSC Business Report; Economic Impact; Workforce Diversity; Procurement Report; and Financial Statement. The John F. Kennedy Space Center KSC originally known as the NASA Launch Operations Center located on Merritt Island Florida is one of the National Aeronautics and Space Administration's NASA ten field centers. Since December 1968 KSC has been NASA's primary launch center of human spaceflight. Launch operations for the Apollo Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida KSC is adjacent to Cape Canaveral Space Force Station CCSFS. The management of the two entities work very closely together share resources and operate facilities on each other's property. Though the first Apollo flights and all Project Mercury and Project Gemini flights took off from the then-Cape Canaveral Air Force Station the launches were managed by KSC and its previous organization the Launch Operations Directorate. Starting with the fourth Gemini mission the NASA launch control center in Florida Mercury Control Center later the Launch Control Center began handing off control of the vehicle to the Mission Control Center in Houston shortly after liftoff; in prior missions it held control throughout the entire mission. Additionally the center manages launch of robotic and commercial crew missions and researches food production and in-situ resource utilization for off-Earth exploration. Since 2010 the center has worked to become a multi-user spaceport through industry partnerships even adding a new launch pad LC-39C in 2015. There are about 700 facilities and buildings grouped throughout the center's 144000 acres. Among the unique facilities at KSC are the 525-foot tall Vehicle Assembly Building for stacking NASA's largest rockets the Launch Control Center which conducts space launches at KSC the Operations and Checkout Building which houses the astronauts dormitories and suit-up area a Space Station factory and a 3-mile long Shuttle Landing Facility. There is also a Visitor Complex on site that is open to the public. National Aeronautics and Space Administration, Kennedy Space Center paperback
2000réf. 86103John F Kennedy Space Center: National Aeronautics and Space Administration 2000. Presumed First Edition First printing. Staplebound. Very good. The format is approximately 8.5 inches by 11 inches. 63 5 pages includes covers. Illustrated front cover. The format is approximately 8.25 inches by 11 inches. Illustrations. This includes information on STS-1 through STS 103 from 1981 to 1999. Not all numbers were reported on. The write-ups include mission highlights EVAs Launch and Landing. This includes information on John Glenn's return to space and the first flight to the International Space Station. The International Space Station ISS is the largest modular space station in low Earth orbit. The project involves five space agencies: the United States' NASA Russia's Roscosmos Japan's JAXA Europe's ESA and Canada's CSA. The ownership and use of the space station is established by intergovernmental treaties and agreements. The station serves as a microgravity and space environment research laboratory in which scientific research is conducted in astrobiology astronomy meteorology physics and other fields. The ISS is suited for testing the spacecraft systems and equipment required for possible future long-duration missions to the Moon and Mars. The Space Shuttle was a partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration NASA as part of the Space Shuttle program. Its official program name was Space Transportation System STS taken from a 1969 plan for a system of reusable spacecraft where it was the only item funded for development. The first of four orbital test flights occurred in 1981 leading to operational flights beginning in 1982. Five complete Space Shuttle orbiter vehicles were built and flown on a total of 135 missions from 1981 to 2011 launched from the Kennedy Space Center KSC in Florida. Operational missions launched numerous satellites interplanetary probes and the Hubble Space Telescope HST conducted science experiments in orbit participated in the Shuttle-Mir program with Russia and participated in construction and servicing of the International Space Station ISS. The Space Shuttle fleet's total mission time was 1322 days 19 hours 21 minutes and 23 seconds. Space Shuttle components include the Orbiter Vehicle OV with three clustered Rocketdyne RS-25 main engines a pair of recoverable solid rocket boosters SRBs and the expendable external tank ET containing liquid hydrogen and liquid oxygen. The Space Shuttle was launched vertically like a conventional rocket with the two SRBs operating in parallel with the orbiter's three main engines which were fueled from the ET. The SRBs were jettisoned before the vehicle reached orbit while the main engines continued to operate and the ET was jettisoned after main engine cutoff and just before orbit insertion which used the orbiter's two Orbital Maneuvering System OMS engines. At the conclusion of the mission the orbiter fired its OMS to deorbit and reenter the atmosphere. The orbiter was protected during reentry by its thermal protection system tiles and it glided as a spaceplane to a runway landing usually to the Shuttle Landing Facility at KSC Florida or to Rogers Dry Lake in Edwards Air Force Base California. If the landing occurred at Edwards the orbiter was flown back to the KSC atop the Shuttle Carrier Aircraft a specially modified Boeing 747. The first orbiter Enterprise was built in 1976 and used in Approach and Landing Tests but had no orbital capability. Four fully operational orbiters were initially built: Columbia Challenger Discovery and Atlantis. Of these two were lost in mission accidents: Challenger in 1986 and Columbia in 2003 with a total of 14 astronauts killed. A fifth operational and sixth in total orbiter Endeavour was built in 1991 to replace Challenger. The Space Shuttle was retired from service following Atlantis's final flight on July 21 2011. National Aeronautics and Space Administration unknown
2008réf. 86137Washington DC: National Aeronautics and Space Administration 2008. Xerox-style reproduction. Assumed to be one of only a limited number made for media representatives. Stapled at upper left corner. Very good. ii 114 pages plus front cover. Illustrations. Three-hole punched. Front cover also includes the logo of the United Space Alliance. Contents include STS-126 Mission Overview; Timeline Overview; Mission Profile; Mission Priorities; Mission Personnel; STS-126 Endeavour Crew; Payload Overview; Rendezvous and Docking; Environmental Contol and Life Support System ECLSS; Solar Alpha Rotary Join SARJ; Spacewalks; Experiments; Advanced Resistive Exercise Device; Shuttle Reference Data; Launch and Landing; Acronyms and Abbreviations; Media Assistance; Public Affairs Contacts. STS-126 was the one hundred and twenty-fourth NASA Space Shuttle mission and twenty-second orbital flight of the Space Shuttle Endeavour OV-105 to the International Space Station ISS. The purpose of the mission referred to as ULF2 by the ISS program was to deliver equipment and supplies to the station to service the Solar Alpha Rotary Joints SARJ and repair the problem in the starboard SARJ that had limited its use since STS-120. STS-126 launched on 15 November 2008 at 00:55:39 UTC from Launch Pad 39A LC-39A at NASA's Kennedy Space Center KSC with no delays or issues. Endeavour successfully docked with the station on 16 November 2008. After spending 15 days 20 hours 30 minutes and 30 seconds docked to the station during which the crew performed four spacewalks and transferred cargo the orbiter undocked on 28 November 2008. Due to poor weather at Kennedy Space Center Endeavour landed at Edwards Air Force Base on 30 November 2008 at 21:25:09 UTC. STS-126 included the Leonardo Multi-Purpose Logistics Module MPLM on its fifth spaceflight. Leonardo held over 14100 lbs of supplies and equipment. Among the items packed into the MPLM were two new crew quarters racks a second galley kitchen for the Destiny laboratory a second Waste and Hygiene Compartment WHC rack lavatory the advanced Resistive Exercise Device aRED two water reclamation racks spare hardware and new experiments. Also included in Leonardo was the General Laboratory Active Cryogenic ISS Experiment Refrigerator or GLACIER a double locker cryogenic freezer for transporting and preserving science experiments. The shuttle also carried irradiated turkey candied yams stuffing and dessert for a special Thanksgiving meal at the station as well as an Official Flight Kit with mementos for those who supported the astronauts and helped them complete their mission successfully. Also carried was a Lightweight MPESS Carrier LMC carrying a Flex Hose Rotary Coupler FHRC and returning a Nitrogen Assembly Tank from Quest for refurbishment. STS-126 was the only mission to land on the temporary runway 04 at Edwards Air Force Base as the main runway was completing refurbishment. The use of the temporary runway required new braking and rollout techniques that have never been used before as the runway is 2990 ft shorter than the normal runway. This was the last landing at Edwards for Endeavour. National Aeronautics and Space Administration unknown
2009réf. 86131Washington DC: National Aeronautics and Space Administration 2009. Presumed First Edition First printing. Comb binding. Very good. 31 3 pages including covers. Contents include Media Services Information; Quick Facts; NASA's Search for Habitable Planets; Scientific Goals and Objectives; Mission Overview; Spacecraft; Instrument - Photometer; Selecting the Kepler Star Field; Education and Public Outreach; Other Exoplanet Activities; Science Team; and Project Management. The Kepler space telescope is a disused space telescope launched by NASA in 2009 to discover Earth-sized planets orbiting other stars. Named after astronomer Johannes Kepler the spacecraft was launched into an Earth-trailing heliocentric orbit. The principal investigator was William J. Borucki. After nine and a half years of operation the telescope's reaction control system fuel was depleted and NASA announced its retirement on October 30 2018. Designed to survey a portion of Earth's region of the Milky Way to discover Earth-size exoplanets in or near habitable zones and estimate how many of the billions of stars in the Milky Way have such planets Kepler's sole scientific instrument is a photometer that continually monitored the brightness of approximately 150000 main sequence stars in a fixed field of view. These data were transmitted to Earth then analyzed to detect periodic dimming caused by exoplanets that cross in front of their host star. Only planets whose orbits are seen edge-on from Earth could be detected. Kepler observed 530506 stars and detected 2778 confirmed planets as of June 16 2023. By January 2015 Kepler and its follow-up observations had found 1013 confirmed exoplanets in about 440 star systems along with a further 3199 unconfirmed planet candidates. Four planets have been confirmed through Kepler's K2 mission. In November 2013 astronomers estimated based on Kepler space mission data that there could be as many as 40 billion rocky Earth-size exoplanets orbiting in the habitable zones of Sun-like stars and red dwarfs within the Milky Way. It is estimated that 11 billion of these planets may be orbiting Sun-like stars. The nearest such planet may be 3.7 parsecs 12 ly away according to the scientists. On January 6 2015 NASA announced the 1000th confirmed exoplanet discovered by the Kepler space telescope. Four of the newly confirmed exoplanets were found to orbit within habitable zones of their related stars: three of the four Kepler-438b Kepler-442b and Kepler-452b are almost Earth-size and likely rocky; the fourth Kepler-440b is a super-Earth. On May 10 2016 NASA verified 1284 new exoplanets found by Kepler the single largest finding of planets to date. Kepler data has also helped scientists observe and understand supernovae; measurements were collected every half-hour so the light curves were especially useful for studying these types of astronomical events. National Aeronautics and Space Administration unknown
1956réf. 85650Paris: Imprimerie Nationale 1956. Presumed First Edition First printing/Limited Edition. Hardcover. Good. Text is in French. Format is approximately 10 inches by 13 inches. 291 5 pages. Illustrations many in color. Annexes including Bibliographie. This work has a decorative cover which has some wear and soiling. Somewhat shaken. Full canvas binding cream with arms of the Legion of Honor reproduction of the plaque of Grand Officier embossed in relief on the first dish. Printing on glossy luxury paper. Ex-library with library bookplate and usual library markings. Edition limited to 7000 copies. This is a very heavy book and if shipped outside of the United States will require additional shipping costs. Preface by General Catroux. Introduction by Yves Malecot Directeur des Monnaies. This magnificent volume contains in addition to all the historical technical and administrative information concerning the French decorations worn or awarded up to the Fourth Republic with the Colonial Orders and the Civil Orders of Merit disappeared afterwards a very abundant iconographic documentation reproducing in particular the ancient and modern medals of the Collection of the Monnaie de Paris. Among the items covered are: Legion d'Honneur Order de la Liberation Medaille Militaire Croix de Guerre Medaille de la Resistance Medailles Commemoratives Orders de Merite Civils Orders del la France d'Outre Mer Medailles d'Honneur and Barrettes. Imprimerie Nationale hardcover
2012réf. 83827Washington DC: National Aeronautics and Space Administration c2012. One of a number of multiple originals. Coin/Medal. Fine. An approximately 2 inch diameter clear plastic case with a 7.75 inch NASA bronze medallion inside. The front side has a colorful center image of the Space Shuttle Orbiter and Launch Vehicle The outer portion has the text "Celebrating the Historic Space Shuttle Program Official Commemorative. The inner text portion states This medallion contains metal flown on a Space Shuttle Mission. The reverse side has an outer ring of text that states: Columbia Challenger Discovery Atlantis Endeavour Mission Complete. The center section is divided into three sections: one depicts the take off of the launch vehicle with orbiter attached; one depicts the orbiter in space with the bay open a satellite deployed and the curve of the earth visible; the final depicts the shuttle landing with parachute deployed. Official NASA Mission Complete Medallion in Antique Bronze contains flown metal material! This official Mission Complete Medallion is 1.75" and commemorates the historic completion of the Space Shuttle Program. In addition this limited edition medallion commemorates the exceptional accomplishments and missions of the first winged-spacecrafts. Minted with the same Shuttle flown ingots included in the NASA Award Medallions this medallion is the second in the series and is also worthy of the program it represents. The official Space Shuttle Program Commemorative Design will be embedded in full color on one side while the other side will dimensionally render a Space Shuttle at work through a launch space mission and landing. These medallions will be plated in Antique Bronze and protected within circular presentation cases with high-density black foam spacers. The Space Shuttle Program was from 1981 to 2011. This design is by Blake Dumesnil. MR. Dumesnil is a senior art director and graphic designer at NASA's Johnson Space Center JSC. Much of the work he does supports the JSC Engineering and Science Directorate as well as the Jacobs-JETS contract. His design work includes all forms of visual presentation and marketing materials used to convey what expertise resources technologies and innovations at JSC in hopes of bringing in new forms of work from a variety of industries. As part of NASA's strive to partner with other industries he has helped represent NASA's involvement in Pumps & Pipes a collaborative effort between the Energy Medical and Aerospace industries in Houston that aims to solve common challenges through new technology and innovation development. In addition to marketing materials he has also had the honor of working with some of the astronaut crews in designing their ISS mission patches and have been personally selected to design some of the agency's anniversary designs as well. National Aeronautics and Space Administration unknown
1991réf. 83822Washington DC: National Aeronautics and Space Administration 1991. Presumed First Edition First printing before correction to replace Discovery with Atlantis. Single sticker sheet printed on both sides. Good. RARE with Discovery attribution. Approximately 5 inches at its highest and 4 inches at its widest. Some soiling noted. STS-43 the ninth mission for Space Shuttle Atlantis was a 9 day mission whose primary goal was launching the TDRS-E satellite TDRS-5. The flight also tested an advanced heatpipe radiator for potential use on the then-future space station and conducted a variety of medical and materials science investigations. Apparently Space Shuttle Discovery was originally intended to fly this mission. From the text on the sticker's peelable back the STS-43 insignia portrays the evolution and continuity of the U.S. space program by highlighting 30 years of American manned spaceflight experience from Mercury to the Space Shuttle. The emergence of the shuttle Discovery from the outlined configuration of the Mercury space capsule commemorates this special relationship. The energy and momentum of launch are conveyed by the gradations of blue which mark the shuttle's ascent from Earth to space. Once in Earth orbit Discovery's cargo bay opens to reveal the Tracking and Data Relay Satellite which appears in gold emphasis against the white wings of Discovery and the stark blackness of space. As primary mission objective the Tracking and Data Relay Satellite System will enable almost continuous communication from Earth to space for future space shuttle missions. The stars on the insignia are arranged to suggest this mission's STS number: four stars left of Shuttle and three starts to the right. NOTE: Later versions of the sticker properly reference the Shuttle Atlantis! The five astronauts are named on the front: Blaha Baker Lucid Adamson and Low. John Elmer Blaha born August 26 1942 in San Antonio Texas is a retired United States Air Force colonel and a former NASA astronaut. He is a veteran of five space missions aboard the Space Shuttle and Mir. Michael Allen Baker born October 27 1953 is a retired captain in the United States Navy former NASA astronaut and the International Space Station Program Manager for International and Crew Operations at NASA's Johnson Space Center. Shannon Matilda Wells Lucid born January 14 1943 is an American biochemist and retired NASA astronaut. At one time she held the record for the longest duration stay in space by an American as well as by a woman. She has flown in space five times including a prolonged mission aboard the Mir space station in 1996; she is the only American woman to have served aboard Mir. George David Low February 19 1956 - March 15 2008 was an American aerospace executive and a NASA astronaut. In addition to holding some technical assignments he logged more than 700 hours in space including stints on the Columbia the Atlantis and the Endeavour Space Shuttles before he left NASA in 1996. James Craig Adamson born March 3 1946 is a former NASA astronaut and retired Colonel of the United States Army. James Adamson flew on two missions STS-28 and STS-43 and completed 263 orbits and 334 hours in space. In terms of mission highlights the primary payload TDRS-E attached to an Inertial Upper Stage IUS was deployed about six hours into flight and the IUS propelled the satellite into geosynchronous orbit. TDRS-5 became the fourth member of the orbiting TDRS cluster. Secondary payloads were Space Station Heat Pipe Advanced Radiator Element SHARE II; Shuttle Solar Backscatter Ultra-Violet SSBUV instrument; Tank Pressure Control Equipment TPCE and Optical Communications Through Windows OCTW. Other experiments included Auroral Photography Experiment APE-B Protein Crystal Growth Ill PCG Ill; Bioserve / Instrumentation Technology Associates Materials Dispersion Apparatus BIMDA; Investigations into Polymer Membrane Processing IPMP; Space Acceleration Measurement System SAMS; Solid Surface Combustion Experiment SSCE; Ultraviolet Plume imager UVPI; and the Air Force Maui Optical Site AMOS experiment. TDRS-E which became TDRS-5 on orbit was successfully boosted to geosynchronous orbit at more than 22000 miles 35400 km 22000 mi above Earth by two firings of the Inertial Upper Stage IUS booster the last of which occurred approximately 12½ hours into the mission. TDRS then deployed its antennas and solar panels and separation from the IUS took place less than 45 minutes later. National Aeronautics and Space Administration unknown
2011réf. 83828Washington DC: National Aeronautics and Space Administration c2011. One of a number of multiple originals. Coin/Medal. Fine. An approximately 2 inch diameter clear plastic case with a 7.75 inch NASA silver medallion inside. The attached image show both the front and back of the single medallion and clear plastic stand. The front side has a colorful center image of the Space Shuttle Orbiter and Launch Vehicle The outer portion has the text "Celebrating the Legacy of the Space Shuttle Program. The reverse side has an outer ring of text that states: Excellence Achieved By Those Who Believed NASA Commemorative. There is a striking image of the Launch Vehicle with Orbiter attached lifting off with the plume billowing at the bottom. The text on the right states: This medallion contains metal flown on the historic Space Shuttle Mission Complete. Both shuttle medals Mission Complete and Legacy celebrate the winged spacecraft and the program's 30 years of innovation and service. These official medallions were minted with metal from the same ingots used for the framed editions that were flown on a shuttle mission. Each medallion features a full color embedded insert of the official Space Shuttle Program Commemorative insignia. Official NASA Mission Complete Medallion in silver contains flown metal material! This official Mission Complete Medallion is 1.75" and commemorates the historic completion of the Space Shuttle Program. In addition this limited edition medallion commemorates the exceptional accomplishments and missions of the first winged-spacecrafts. This medallion is one of a series of two and is also worthy of the program it represents. These medallions will be plated in silver and protected within circular presentation cases with high-density black foam spacers. The Space Shuttle Program was from 1981 to 2011. National Aeronautics and Space Administration unknown
2007réf. 84040Washington DC: National Aeronautics and Space Administration 2007. Final Report--Presumed first edition first printing. Wraps. Very good. Format is approximately 8.5 inches by 11 inches. 272 pages. Illustrated front and back cover. Illustrations mostly in color. Definition of Terms. References. Appendices. Minor cover wear noted. NASA letter of appreciation to a senior National Nuclear Security Administration technical expert for support to this report. In the 2005 Budget Authorization Act the U.S. Congress directed the NASA Administrator to provide an analysis of alternatives to detect track catalogue and characterize potentially hazardous near-Earth objects NEO. Congress required that the Administrator submit a program by December 28 2006 to survey 90% of the potentially hazardous objects measuring at least 140 meters in diameter by the end of 2020. In addition the legislation required the Administrator to submit an analysis of alternatives that NASA could employ to divert an object on a likely collision course with Earth. A study team led by the Office of Program Analysis and Evaluation PA&E derived requirements and figures of merit from the Act and used these factors to evaluate the alternatives. The team developed a range of options from public and private sources and then analyzed their capabilities levels of performance life-cycle costs schedules and development and operations risks. This document presents the detailed results of these analyses. A summary report was submitted to Congress in December of 2006. During related Congressional testimony on this report it was stated that The report's basic conclusion is that ``NASA recommends that the program continue as currently planned and we will also take advantage of opportunities using potential dual-use telescopes and spacecraft--and partner with other agencies as feasible--to attempt to achieve the legislated goal within 15 years. However due to current budget constraints NASA cannot initiate a new program at this time.'' In addition the report contained a number of additional findings including: ``The goal of the Survey Program should be modified to detect track catalogue and characterize by the end of 2020 90 percent of all Potentially Hazardous Objects PHOs greater than 140m whose orbits pass within 0.05 AU of the Earth's orbit as opposed to surveying for all NEOs; The Agency could achieve the specified goal of surveying for 90 percent of the potentially hazardous NEOs by the end of 2020 by partnering with other government agencies on potential future optical ground-based observatories and building a dedicated NEO survey asset assuming the partners' potential ground assets come online by 2010 and 2014 and a dedicated asset by 2015; Together the two observatories potentially to be developed by other government agencies could complete 83 percent of the survey by 2020 if observing time at these observatories is shared with NASA's NEO Survey Program; New space-based infrared systems combined with ground-based assets could reduce the overall time to reach the 90 percent goal by at least three years. Space systems have additional benefits as well as costs and risks compared to ground-based alternatives; Radar systems cannot contribute to the search for potentially hazardous objects but may be used to rapidly refine tracking and to determine object sizes for a few NEOs of potentially high interest. Existing radar systems are currently oversubscribed by other missions. Determining a NEO's mass and orbit is required to determine whether it represents a potential threat and to provide required information for most alternatives to mitigate such a threat. Beyond these parameters characterization requirements and capabilities are tied directly to the mitigation strategy selected.''. National Aeronautics and Space Administration paperback
1953réf. 83600Washington DC: United States Government Printing Office 1953. Presumed First Edition First printing. Wraps. Good. iv 85 7 pages. Fold-outs. Figures. Tables. Scarce original issue. Appendix A; Description of Source Maps and Supplementary Material; Appendix B: Urban Feature Maps Needed for Urban Analysis; Appendix C:Method of Estimating Day Population; and Appendix D: Official Civil Defense Publications. This Technical Manual presents methods and procedures for use by city civil defense organization in preparing a civil defense urban analysis. An urban analysis is the process of collecting presenting analyzing and utilizing pertinent information about urban areas. Since the primary purpose of a civil defense urban analysis is to provide the tools for undertaking realistic civil defense planning all pertinent aspects of the city must be considered. Assembling data and presenting the information graphically on maps is only the first step in an urban analysis. The area in which an exploded A-bomb can cause maximum casualties and physical damage must be located. Then a hypothetical attack must be be assumed and the damaged assessed. From this is determined not only the potential causalities but also the potential damage to each urban feature. Next the physical area of the city must be organized for operations and operational plans developed by the civil defense services. In this manner the urban analysis can be of practical use rather an than as a mere reference material to be looked at occasionally before the attack or to be referred to after the attack. Maximum utilization should be made of available maps and data in municipal and other public agencies as well as those in private institutions. The contents include: Factors affecting civil defense urban analysis; Maps used in urban analysis Target analysis Method of estimating damaged to structures and facilities; Mass fire potential; Techniques for estimating casualties and uninjured-unhoused Maps used in planing operations. There are also included four appendices. United States civil defense refers to the use of civil defense in the history of the United States which is the organized non-military effort to prepare Americans for military attack. Late in the 20th century the term and practice of civil defense fell into disuse. Emergency management and homeland security replaced them. The new dimensions of nuclear war terrified the world and the American people. The sheer power of nuclear weapons and the perceived likelihood of such an attack on the United States precipitated a greater response than had yet been required of civil defense. Civil defense something previously considered an important and common-sense step also became divisive and controversial in the charged atmosphere of the Cold War. In 1950 the National Security Resources Board created a 162-page document outlining a model civil defense structure for the US. Called the "Blue Book" by civil defense professionals in reference to its solid blue cover it was the template for legislation and organization that occurred over the next 40 years. Despite a general agreement on the importance of civil defense Congress never came close to meeting the budget requests of federal civil defense agencies. In declassified US war game analyses of the late 1950-60s it was estimated that approximately 27 million US citizens would have been saved with civil defense education in the event of a Soviet pre-emptive strike. At the time however the cost of a full-scale civil defense program was in cost-benefit analysis deemed less effective than a BMD system and as the adversary was increasing their nuclear stockpile both programs would yield diminishing returns. United States Government Printing Office paperback
1982réf. 81051Pasadena CA: California Institute of Technology Jet Propulsion Laboratory 1982. Tailored compilation unknown number of these specific sets assembled. Folder with multiple inserts. Good. Scarce compilation of publications and 14 photographs. Folder is worn/torn and approximately 9 inches by 12 inches with impressive color space photographs on front and back. Inside there are two/pockets with text and inserts in each side. On the left side there is a pamphlet JPL Closeup approximately 8.5 inches by 8.5 inches. 16 pages plus covers. Illustrated. Dated 5/80. The second item is entitles Voyager at Saturn: 1981. It is approximately 8.5 inches by 11 inches. It has an illustration on the front cover. It is dated on the back as produced in 1981. It is 16 pages plus covers with illustrations some in color. On the right side is Voyager 1 Encounters Saturn JPL 400-100 dated 12/80. It is approximately 8.5 inches by 11 inches. It has 40 pages plus covers and is illustrated some in color. There are 6 8.5 inches by 11 inch color photographs with substantial text on the back of each. The Voyager Jupiter photographs are designated Voyager 1-47 P-21182 March 3 1979 Voyager 1-143 P-21457 March 3 1979 Voyager 1-149 P-21631 undated; Voyager 1-S-13 P-23058 November 6 1980 Voyager 1-S-54 P-23178 November 15 1980 and Voyager 1-S-82 P=23400 undated. There are 8 approximately 8 inch by 10 inch photographs 2 in black and white and six color. The Voyager Jupiter images are P-23876C August 13 1981 P-23912C/BW August 21 1981 P-23913C August 21 1981 P-23887C/BW August 24 1981 P-23922C August 24 1981 P-23927C August 25 1981 P-23932BW August 25 1981 and P-23933BW August 25 1981. Each image back has text taped to it. Folder with multiple inserts The Jet Propulsion Laboratory is a research development and flight center owned by the National Aeronautics and Space Administration and operated by the California Institute of Technology. JPL's primary responsibility is the investigation of the solar system with automated scientific spacecraft. The Laboratory's activities however are not limited to space exploration. The basic research and development in support of space exploration involves a broad spectrum of scientific and engineering disciplines; the resulting technological and managerial capabilities are finding increasing application to medical and environmental problems on earth especially in the area of solar energy research. To provide spacecraft tracking and communications for deep-space missions JPL designed developed and manages the Deep Space Network DSN with stations in California Spain and Australia. The twin Voyager 1 and 2 spacecraft are exploring where nothing from Earth has flown before. Continuing on their more-than-40-year journey since their 1977 launches they each are much farther away from Earth and the sun than Pluto. In August 2012 Voyager 1 made the historic entry into interstellar space the region between stars filled with material ejected by the death of nearby stars millions of years ago. Voyager 2 entered interstellar space on November 5 2018 and scientists hope to learn more about this region. Both spacecraft are still sending scientific information about their surroundings through the Deep Space Network or DSN. The primary mission was the exploration of Jupiter and Saturn. After making a string of discoveries there — such as active volcanoes on Jupiter's moon Io and intricacies of Saturn's rings — the mission was extended. California Institute of Technology, Jet Propulsion Laboratory unknown
1951réf. 82075Washington DC: U. S. Government Printing Office 1951. Presumed first printing of this semi-annual issuance. Wraps. Good. vi 119 1 pages. Stamp and ink initials on front cover. Footnotes. Tabular information. Commonly used abbreviations Sources of Information Name Index. Index. Minor damp staining at top and side edges of some rear pages. The Handbook of Emergency Defense Activities is a guide to Federal Agencies whose activities are primarily devoted to mobilization or to other related phases of the defense program. Many previously existing agencies have been delegated vital defense functions or have directed their regular functions toward the defense program. The Handbook includes brief organizational outlines and the names and addresses of officials of emergency defense agencies the Department of Defense and the United States Coast Guard. It also includes a separate list of officials from whom information may be obtained concerning other Federal agencies. The Handbook is designed to assist the public in reaching the services it needs in connection with the defense program. The Handbook is issued twice a year and the printing of this publication has been approved by the Director of the Bureau of the Budget. Among the organizations included are: Air Coordinating Committee which was an interdepartmental committee established to consider policy problems involving military and civil matter; the Atomic Energy Commission Defense Materials Procurement Agency Defense Production Administration the Defense Transport Administration Subversive Activities Control Board and the National Security Resources Board among others. This is a snapshot of both the Cold War and the hot war in Korea. U. S. Government Printing Office paperback
2008réf. 82252Washington DC: National Nuclear Security Administration 2008. Presumed First Edition First printing thus. Single sheet printed on both sides. Very good. This is an approximately 8.5 inch by 11 inch sheet of stiff card paper folded at the center to create four 5.5 by 8.5 inch panels. Illustrations are on the front and back panels. Text is on all panels. Marty was born February 191953 in St. Louis Park Minnesota. He was a graduate of Montgomery High School in 1971 the U.S. Naval Academy in 1975 and the George Washington University in 1981. Marty was a U.S. Naval officer for 20 years and civil servant for 20 years with 8 of those years in the Senior Executive Service of the U.S. Department of Energy. He retired for the third time in April 2018 after 4 years at Honeywell. Marty honorably served his country in a number of Uniformed Service civilian and private sector career. This event program marked his departure from the Office of Defense Programs to take on a critically important Department of Energy position at the United States Embassy in Beijing People's Republic of China where he was the Secretary's Representative and Senior DOE representative in China. Copies of such event programs rarely survive the event itself. Presiding at the departure event was Deputy Administrator for Defense Programs Robert L. Smolen and making the major presentation was Thomas P. D'Agostino Administrator of the National Nuclear Security Administration. The senior representative of the United States Department of Energy at the U.S. Embassy in Beijing China is responsible for leading a team to advance U.S. security and economic interests in the areas of energy science and technology and nuclear security and nonproliferation. In this role the senior representative is responsible for developing analyses and recommendations for the Secretary on key strategic initiatives with China related to the overall energy relationship. The representative is responsible for conducting in-depth analyses for comprehensive energy policy planning and strategic decision making on international energy policy and investment and trade issues. The representative provides insights briefings and other comprehensive analyses on key energy issues in China and Asia more broadly including on the issues of energy security clean energy development and deployment energy efficiency clean energy technology innovation and bilateral and multilateral cooperation initiatives among others. National Nuclear Security Administration unknown
1957réf. 82359Battle Creek MI: Federal Civil Defense Administration National Headquarters 1957. Copy one of unknown number of multiple contemporary copies of Memorandum with draft attached. Two-hole punched disbound held together with a clip. Good. Cover memorandum with number stamps ink notations and the name Donald J. Kimeldorf on front. transmitting a draft copy of a proposed FCDA Technical Bulletin on the Radiobiologic Effects of Radiation. Memorandum was signed out by Jack C. Greene Director of the Radiological Defense Division. RARE SURVIVING COPY OF NEAR FINAL DRAFT. Draft dated 2-25-57 and with a number stamped on first page has 21 pages Appendix A 6 figures and Five additional figures. This bulletin is divided into five major sections: The first section concerns basic radiobiologic information that is required for the basis of answers given in sections II IIIm and IV. Sections II III and IV deal with topics concerning injury to human beings; environmental modifications and population group injury. They are presented in question and answer form. Section V gives a general discussion of civil defense applications of this information. The reason for preparing this bulletin in advance of publication of the NCRP Sub-Committee Handbook on "Irradiation Injury" was to provide guidance that was deemed urgently needed by civil defense planners. Survival studies in which plans for defense against nuclear attack needed guidance of this type to formulate realistic scenarios. This bulletin was intended to serve as an interim measure until the Committee's more complete treatment became available. Kimeldorf was a major scientific leader. His book with Ed Hunt entitled "Ionizing radiation: Neural function and behavior" is a thorough description of the physiological and behavioral effects of exposure to ionizing radiation. The Federal Civil Defense Administration FCDA was organized by President Harry S. Truman on December 1 1950 through Executive Order 10186 and became an official government agency via the Federal Civil Defense Act of 1950 on 12 January 1951. In 1958 the FCDA was superseded by the Office of Civil and Defense Mobilization when President Dwight D. Eisenhower merged the FCDA with the Office of Defense Mobilization. In its early years the agency focused on evacuation as a strategy. The FCDA was first headed by Millard Caldwell under Truman then Val Peterson under Eisenhower. Jack C. Greene received his B.S. in electrical engineering from MIT in 1947 and his Masters in engineering administration from the George Washington University in 1970. He served with the Manhattan District at Oak Ridge during WWII after which he was a member of the AEC'S Radiation Instrument Branch until joining the then newly created civil defense agency in 1951. Since that time Mr. Greene had been associated with civil defense related technical and scientific activities including radiological instrument development nuclear weapons test programs and other research. From 1962 through 1973 he headed the Postattack Research Division which included responsibility for civil defense fallout studies. Mr. Greene then became DCPA'S Deputy Assistant Director for Research. Federal Civil Defense Administration, National Headquarters unknown
2001réf. 809962001. Fourth Printing stated. Velobound. Very good. Various paginations approximately 180 pages. Illustrations color. Bibliography. Appendices A-K includes Glossary and Acronyms. Figures. Distribution memorandum laid in. In its fiscal year FY 2001 Energy and Water Development Appropriation Congress directed the National Nuclear Security Administration NNSA to complete a study that "includes conclusions as to whether the full-scale NIF National Ignition Facility is required in order to maintain the safety and reliability of the current nuclear weapons stockpile and whether alternatives to the NIF could achieve the objective of maintaining the safety and reliability of the current nuclear weapons stockpile." To meet this requirement the NNSA has conducted a detailed study of the role of high-energy-density physics HEDP and NIF in the Stockpile Stewardship Program SSP. The principal finding of this study is that a vital HEDP Program is an essential component of the SSP. Based on this finding the Office of Defense Programs DP recommends the continuation of the baseline HEDP Program including 192-beam NIF with the goal of achieving ignition. Section 3.4.6 addresses an aspect of nuclear weapons effects testing. Section 4.4 is entitled Weapons Effects. The SSP was established in response to the FY 1994 National Defense Authorization Act P.L. 103-160 Sect. 3138 which called on the Secretary of Energy to "establish a stewardship program to ensure the preservation of the core intellectual and technical competencies of the United States in nuclear weapons." In the absence of nuclear testing the SSP must: 1 support a focused multifaceted program to increase the understanding of the enduring stockpile; 2 predict detect and evaluate potential problems due to the aging of the stockpile; 3 refurbish and remanufacture weapons and components as required; and 4 maintain the science and engineering institutions needed to support the nation's nuclear deterrent now and in the future. The principal outcomes of the SSP are confidence in safety security and reliability of U.S. nuclear weapons and a cadre of nuclear-skilled personnel underpinning nuclear deterrence. The NNSA national laboratories agree that a strong and diverse HEDP Program is an essential component of the SSP. An excellent understanding of high-energy-density physics is required to understand the operation of nuclear weapons. The fundamental requirements for the baseline HEDP Program are driven by meeting the needs of the stockpile and by a commitment to related broader national scientific interests. Based on these requirements the HEDP Program has developed a set of strategic goals in the following areas: weapons physics ignition high yield radiation effects basic science and supporting technologies. To determine if the HEDP Program is properly optimized to meet the needs of DP's mission DP invited senior members of the defense and scientific communities to examine high-energy-density activities conducted throughout the SSP. These study panel members were asked specifically to assess the role of high-energy-density physics within the SSP and to examine the facilities and program elements within the HEDP Program to assure that the goals of the SSP are met in the near and long term. Two areas that were not included directly in this study were HEDP activities within the Advanced Simulation and Computing Campaign and the cost considerations associated with developing and operating the necessary experimental computational manufacturing and production capabilities required for the SSP. unknown
2008réf. 80995Washington DC: National Nuclear Security Administration Office of Nonproliferation Research and Development NA-22 2008. Presumed First Edition First printing. Spiral bound. Very good. 27 1 pages including covers. Marked Official Use Only. This limitation is understood to no longer apply due to the passage of time and the public disclosure of comparable information in Congressional Budget Requests Congressional testimony and other information releases. The Atomic Energy Commission originally established the "Aerial Measurements Operations" at Nellis Air Force Base in Las Vegas Nevada in the 1950s. It was created to serve the worldwide emergency system by providing rapid response to radiological emergencies. In 1976 the DOE established an Aerial Measurements Operations at Andrews Air Force Base - now called Joint Base Andrews - in Maryland to provide scientific and technical support to counterterrorism efforts during U.S. Bicentennial events in Washington D.C. With a location on each coast the RSL has served for over 50 years as a valuable national asset for nuclear emergency response and remote sensing capabilities. The Remote Sensing Laboratory RSL is a center for creating and using advanced technologies that provide a broad range of scientific technological and operational disciplines with core competencies in emergency response operations and support remote sensing and applied science and technologies in support of counterterrorism and radiological incident response. The National Nuclear Security Administration's NNSA Office of Nonproliferation Research and Development NA-22 has undertaken a multi-year planning effort to focus its research and development R&D efforts on enabling technologies to improve U.S. capabilities to detect and monitor nuclear weapons production proliferation and testing worldwide. NA-22 has developed an expert Remote Sensing Program working group to assist in this planning. This document is the initial result of the planning effort and its purpose was to established the program's goals objectives and requirements. The primary intent of this document is to 1 provide guidance to the investigators at national laboratories other NA-22 program managers and the user community to better focus future Remote Sensing Program proposals 2 provide a vehicle for user community input and 3 serve as a starting point for the subsequent technology roadmapping process. National Nuclear Security Administration, Office of Nonproliferation Research and Development (NA-22) unknown
2010réf. 80985Washington DC: National Nuclear Security Administration Defense Programs 2010. Presumed first compilation--The number of copies made is unknown. Three Ring Binder. Good. Attendance list of 12-13 2011 Jan Surveillance Summit in front pocket--more than 30 names. List of 19 filled tabs 31 tabs present for 20-31 do not appear to have ever been filled. Tabbed items include: Effective Surveillance Program Memo dated 26 April 2010 then SNL LLNL and LANL responses then Requirements Workload Planning document of 22 Oct. 2010 followed by LLNL SRS KCP LANL PX SNL. Y12 NSO responses to the 22 Oct Memo followed by Summary of responses to 22 Oct Memo then followed by FYNSP responses from LLNL LANL and SNL followed by a Consolidated FYNSP responses. The 19th tab has the slides for workload meeting. Additional material in rear pocket: Surveillance Enterprise Governance 34 hard copy vugraphs 4 to a page--with some ink notations One page on NNSA Nuclear Weapons Surveillance Program 2 copies--one with notes on back One vugraph on FY 11 Surveillance Requirements and Over Targets with substantial notes Additional information on Consolidated Six Year Surveillance Requirements 12 sheets Greenaugh e-mail on Requirements workload 2 pages staples Illinger e-mail on Baselining New Surveillance Requirements 3 pages stapled Mangum e-mail on Surveillance Numbers 3 pages stapled 1 page on requires by site and funding program E-mail from Mangum on surveillance numbers 2 pages stapled with notes e-mail from Sinkular on NA 12 update 2 pages stapled with notes. Notes on November 5 2010 Goodrum Memo Teleconference and one page hardcopy vugraph on FY 11 Surveillance comparison. The use of data from surveillance of our nuclear weapons enables us to predict how the weapons will perform over time without nuclear explosive testing. This capability has improved significantly over the past decade and provides us with the capability to ensure an effective nuclear stockpile. Surveillance information is critical for the predictive models used in the annual nuclear weapon assessment process. These tools and the detailed quantitative modeling they support serve as key elements of the capability to maintain a safe secure and effective U.S. nuclear weapons stockpile without underground nuclear explosive testing. The National Nuclear Security Administration NNSA annual assessment process has evolved significantly since the end of underground nuclear explosive testing to ensure an effective nuclear weapons stockpile. The current approach aims to achieve a comprehensive science-based understanding of nuclear weapon systems. Surveillance tools and models play critical roles in providing information essential to assessing weapon safety security and performance changes that would impact military effectiveness without performing underground nuclear explosive tests. These surveillance tools aid in the understanding of two conditions of weapons systems: the "as-built" and "as-aged" conditions. The "as-built" condition reflects the frequency and severity of original design or manufacturing defects. The "as-aged" condition reflects the evolution of age-related changes in materials components and subsystems that can alter performance. Over the last few years several advances in this area have contributed to a better understanding of the condition of our existing nuclear weapons and the ways in which the current condition could affect safety reliability or performance. Through the weapons surveillance program the U.S. has in-depth knowledge of the core components housed within weapons by using technologies such as nondestructive laser gas sampling and high-resolution computed tomography. System tests also assess the functionality of all major non-nuclear components. National Nuclear Security Administration, Defense Programs unknown